Services Rendered
- Existing Conditions Analysis
- Development of Design Alternatives
- Environmental Investigations
- Economic and Feasibility Analysis
- Upland Master Planning
- Shoreline Stabilization Alternatives Evaluation
- Bulkhead Design
- Financing Redevelopment through NPO
- Final Design (CDs and DDs)
- Contract and Construction Administration
Project Summary
The State of Delaware Department of Natural Resources and
Environmental Control (DNREC) selected ATM to provide professional
engineering, contract and construction management services for the
complete reconstruction of an existing 306 slip public marina facility
(Delaware Seashore State Park). The re-development project was designed
to correct the severe infrastructure deterioration at the facility. ATM
services included existing conditions analysis, development and analysis
of design alternatives, environmental investigations, economic and
feasibility analysis and Pro Forma development. In 2002, DNREC again
turned to ATM to lead a multi-discipline team through project
completion. Permitting and design of a 274 wet slip and 174 dry storage
marina was completed in the Summer of 2003.
In addition to the marina and floating dock design, the effort included
an evaluation at different methods for stabilizing the basin shoreline,
and the design of two steel sheet pile bulkheads.
Phase I construction was completed in the Fall-Winter of 2003-2004.
Phase II construction was completed in for Fall-Winter of 2004-2005. The
dry storage building was constructed in Fall-Winter 2005-2006.
|