ATM provided marina design and engineering consulting services on the Burlington Harbor Marina, Vermont

ATM Project Highlighted in Marina Dock Age

ATM provided marina design and engineering consulting services on the Burlington Harbor Marina (Vermont), a transformational project highlighted in Marina Dock Age at the following link: https://www.marinadockage.com/burlington-harbor-marina-transforms-city-waterfront/

Jebel Ali Marina, UAE

Lessons Learned in the United Arab Emirates (UAE)

An informative article written by David Canfield, PE, a principal with ATM and the managing director of ATM’s Dubai (UAE) office is in the current issue of MARINA WORLD Magazine. The article focuses on marina refurbishment and the lessons learned in the UAE as well as US. The article can be accessed here: http://library.marinaworld.co.uk/july-august-2019-marina-world/62734186/39

Marina Dock Age logo

ATM Mentioned in Marina Dock Age

ATM’s waterfront team was mentioned in a Marina Dock Age article on the Burlington Harbor Marina. ATM served as the lead marina consultant for this new 160-slip marina on the northern shore of Lake Champlain in Burlington, Vermont. The article can be accessed here: https://www.marinadockage.com/burlington-harbor-marina-transforms-city-waterfront/.

MENU